Jomo Kenyatta International Airport is located in the capital of Kenya and is the largest airport in the East and Central African region and a major hub for Africa. In 2013, the airport welcomed a total of 6 million passengers.

TuffInnovations headed the initial facilitation of the steel pre-fabrication, fabrication and installation on site.

Our role in this particular project was to facilitate the steel pre-fabrication, fabrication and installation on site.

  1. Designing, fabricating and installing of a 640RM custom built reusable self supported hoarding which consisted of 2.4m x 2.1m pre-fabricated tubular frames with pre-painted corrugated iron sheets which were laid diagonally opposite adjacent panels allowing for dynamic lateral loads of up to 0.74KN/Sm or a wind speed of 33M/S.
  1. Fabrication and installation of a customised ‘bumble bee’ painted Roder HTS Hocker designed 4 inch thick steel pipe brush barriers in varying lengths and types from 1.5M – 5.7m lengths.
  2. Production, fabrication and installation of ‘made to measure’ stainless steel panels throughout the Terminal for the AC Ventilation systems.

Tuff Innovations Limited solely managed this airport project over an 8week period from the point of commissioning. This project was secured with 100% performance bonds through our long-standing relationships with partner banks and insurance companies. Ultimately, this provides a high gauge for productivity and efficiency deadlines to be met for full customer satisfaction.

It is only upon 100% client product and service delivery satisfaction that bonds are successfully terminated.

*Terms and conditions apply to warrant performance bonds and guarantees.